Sweeping 60-degree swivel design prevents kinking and routes extensions safely away from wheel hardware
– Delivers high-capacity, unrestricted airflow from the base spud to your flexible lines
– Fully compatible with MT-3000 extensions, R-520 core housings, and 6185 check valves for seamless system building
– Built to endure the most punishing underground and open pit operating environments
Sweeping 60-degree swivel design prevents kinking and routes extensions safely away from wheel hardware
– Delivers high-capacity, unrestricted airflow from the base spud to your flexible lines
– Fully compatible with MT-3000 extensions, R-520 core housings, and 6185 check valves for seamless system building
– Built to endure the most punishing underground and open pit operating environments
Streamline Super Large Bore inflation with a high-clearance, sweeping angle.
Offering a shallower, sweeping bend to provide optimal hose routing and air chuck access for the massive tyres on your earthmoving and mining fleet. As the essential second component of your SLB system, this robust connector screws onto the spud, utilising its 60-degree swivel to guide air lines smoothly away from potential pinch points. By seamlessly connecting to MT-3000 flexible extensions, R-520 core housings, or 6185 check valves, it maximises airflow to drastically cut down inflation and deflation times on your heaviest machinery.
New rims sourced to suit your equipment, tyre specifications and operational requirements.
Quality second-hand tyres available for purchase, with Tyre Doctor also buying surplus and used mining tyres.
Premium mining tyre solutions for underground and surface operations, tailored to your equipment, application and site conditions.
Limited edition Tyre Doctor tee celebrating 40 years, combining comfort, durability, and everyday wearability.